Hamlet in Plan-les-Ouates · House, villa and apartment
Building permit, APA and application file in Arare-Dessus
Before your work, gather the plans and describe the planned changes. If you want to change an opening in the building, the location and appearance of the opening are among the information to prepare with the building. Scheduling constraints should be stated without presuming the duration of the work.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Arare-Dessus?
Describe the home and what you expect from the work. We come and see before drafting the quote. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To change an opening in the building, your quote request should specify the key dates and the periods when access is possible. Present the planned changes with the plans and any discussions already under way before planning the work. The quote can then distinguish the work to go ahead with from the options to discuss.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
The procedures depend on the building and the type of work. A bathroom, an opening in the facade or a change to the roof must be presented with the structures concerned to check the applicable regime before the work is confirmed.
Depending on the scale of the project, the file follows a fast-track procedure or a definitive application. The second is longer and more complete. We tell you which one applies as soon as the project is drawn.
The zone of the plot changes a lot
The same application is not handled in the same way in a villa zone, an agricultural zone or a hamlet zone. For an old farmhouse, converting a farm building into housing is closely regulated. The cantonal departments look at the volume, the openings, the roofing materials and the general appearance of the building.
Before drawing anything, we consult the zoning plans and the data for the plot. This avoids proposing a project that has no chance of being accepted. For a hamlet such as Arare-Dessus, the commission that examines the appearance of buildings may also be consulted.
Putting together a complete file the first time
An incomplete file comes back with a request for documents and the timescale starts again. We prepare the site plans, the plans, sections and elevations, the description of the work and the energy documents when required. For a conversion, photos of the current state are attached.
Neighbours can consult the file once it has been published. A project that is clearly explained and close to the surrounding buildings generally goes through more easily.
Linking the permit and the work
We prepare the file with the execution already in mind. The plans submitted must match what the team will then build. As soon as the canton approves, the work schedule can start. Send us a sketch or a few photos and we will look at what procedures your project requires.
The most common items
Here is what the works can cover. We sort it out together during the visit.
- Identifying the approvals to obtain
- Checking the scope subject to a permit
For business premises in Arare-Dessus, the work is planned to limit the closure.
Frequently asked questions about building permits in Arare-Dessus
The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.
It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
We gather the plans and technical documents with the architect or engineer when one is needed.
How we work in Arare-Dessus
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Arare-Dessus? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.