Locality in the canton of Geneva · House, villa and apartment
Tiler in Bellevue, floor and wall tiling
MS Contractor SA studies your tiling installation or renovation project in Bellevue with the existing structures and installations. If you want to lay outdoor tiles, the levels, thresholds and path of the water must be examined with the uses of the terrace. The limits of the finishing work are discussed in relation to the neighbouring surfaces, not just the work area.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Bellevue?
Send us a description and two or three photos. The quote is made after seeing the site. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To lay outdoor tiles, your quote request should specify the junctions and where you want the finishing repairs to stop. Specify the surfaces and the junctions to keep so that the preparation of the substrate is included in the quote. This information helps specify the items in your quote.
Preparing your tiling project
The choice of tiles is prepared together with the condition of the substrate and the use of the room.
- State the approximate areas to tile and the existing coverings.
- Photograph the floors, corners, thresholds and areas exposed to water.
- Share the formats or styles you would like and the equipment to keep.
The visit is used to examine flatness, junctions and the preparation needed.
Laying over the existing covering is only decided after its condition has been checked.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of the wooden doors and frames in an entrance hall with white walls and a tiled floor.

View of the sanitary fixtures and brown tiled walls of a bathroom whose fittings are being installed.

Sanitary fit-out with a wall-hung toilet, white basin and brown tiled wall covering.
Examining the substrate before tiling work
We check the flatness and soundness of the floor. An old cracked screed is repaired or covered with a levelling compound. On old tiles, the new ones can sometimes be glued directly, provided the old tiles are well bonded and the height allows it.
In wet rooms, liquid waterproofing is applied before laying. It runs up the walls in the shower and around the bath.
Large formats and choosing the model
Tiles of 60 by 120 or larger are in high demand in villa living rooms. They require a perfectly flat floor and adhesive applied to both sides. We use levelling clips to avoid lippage.
Porcelain stoneware is suitable almost everywhere. For a shower, we choose a slip-resistant surface. For a kitchen floor, epoxy grout resists stains better.
The tile layout makes it possible to plan the cuts and the position of the joints before laying. If you want continuity between the living room and the terrace, present both surfaces. The levels, thresholds and tile characteristics must be studied for each use.
Outdoors, a different job
A tiled terrace is exposed to frost. We use frost-resistant tiles laid on pedestals or on a draining screed with a fall. Without water drainage, the joints crack in the first winter.
Near the lake, humidity encourages moss on shaded surfaces. A tile with a textured surface stays less slippery.
Finishes and schedule
The joints are grouted once the adhesive has set. The corners receive trims or flexible silicone joints. We let everything dry before a shower is used.
In a renovation in Bellevue, the tiler comes after the plumber and before the units are installed. We organise this sequence. Send us the areas and your tiling ideas to prepare the visit.
What we do in Bellevue
We will not sell you what you do not need. The visit is there precisely to check this.
- Grout, junctions and finishes
- Floor and wall tiling
- Substrate preparation and flatness
- Waterproofing wet areas
We also work for businesses in Bellevue. Shop, pharmacy or office, the works are organised around opening hours.
Frequently asked questions about tiling in Bellevue
Grout suited to water and easy to maintain. We discuss it according to the use of the room.
Yes. They require a very flat substrate. We prepare it before laying.
The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.
Sometimes yes, if the old ones are well bonded and flat. Otherwise we remove them.
How we work in Bellevue
Before laying, we check that the substrate is flat and dry, and we set out the pattern from the centre line of the room. Large formats are laid with adhesive on both the tile and the floor.
In showers, the waterproofing is applied under the tiles. The flexible joints in the corners and the thresholds are finished last.
Planning a project in Bellevue? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
