MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Plastering in Bellevue, partitions, wall linings and false ceilings

Present your plastering and partition project in Bellevue with the available plans and the result you want. If you want to straighten or finish a wall, the condition of the substrate and the planned finish guide the repairs to be defined. Distinguish the elements to keep from those that need to be redone.

Our projects
Plastering, smooth partitions and ceiling in a corridor

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Let’s talk about your home in Bellevue

Send us a description and two or three photos. The quote is made after seeing the site. We give you a no-obligation quote.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To straighten or finish a wall, your quote request should specify the boundaries between the parts being kept and the new work. Specify the uses and the junctions with the floors, walls and equipment being kept. With this information, MS Contractor SA can specify the scope to be priced.

Specifying your partition and ceiling needs

A room may need a new layout, a repair or surface preparation.

  • Draw the partitions to create or move and note the approximate height of the rooms.
  • Add photos of the ceilings, cracks and existing junctions.
  • Specify the equipment to integrate and the planned use of each space.

We examine the substrates, service routes and the finishes you want.

The function of an existing partition must be checked before it is modified.

Present my project

Details for your project

Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Corridor with curved partitions, a round porthole and green and yellow patterns
Curved partitions and porthole window

Interior fit-out with curved partitions, a porthole opening and decorative paintwork with green and yellow patterns.

Corridor with a porthole, light-coloured doors and painted green and yellow patterns
Decorative corridor paintwork

Decorative paintwork with green and yellow patterns on the walls of a corridor, around a porthole and light-coloured doors.

Interior corridor with porthole doors and curved partitions
Porthole doors and curved partitions

View of an interior corridor with porthole doors, interior windows and curved partitions in light tones.

Request my detailed quote

Examining the substrates and plasterwork

Plasterboard partitions on a metal frame go up quickly and cleanly. We fill the inside with mineral wool to reduce noise between bedrooms. In a bathroom, we use moisture-resistant boards.

Reorganising a villa floor becomes simple. A large bedroom can be split in two or a walk-in wardrobe created without touching the structure of the house.

Interior doors are positioned during assembly. We build their frames into the structure so that they close properly. In a villa in Bellevue, we often take the opportunity to fit a pocket sliding door, which takes less space.

False ceilings and linings

A false ceiling hides ventilation ducts, cables and pipes. It allows spotlights to be recessed. It also lowers the height of the room, which must be kept in mind in houses with low ceilings.

Against a cold external wall, an insulating lining improves comfort. We fit it with a vapour barrier to prevent condensation. In a house by the lake, this detail prevents mould behind the furniture.

Plastering and repairs

On old walls, we apply a gypsum plaster to get back a flat surface. Cracks are opened, reinforced with tape and filled. Corners are protected with angle beads.

The finish is chosen according to what will go on top. A matt paint tolerates a slight irregularity. A satin paint under raking light shows everything. We then skim in several passes.

Dust and timing

Sanding plaster produces fine dust. We seal off the rooms with sheeting and use sanders connected to a vacuum. Drying takes time, especially in winter or in a poorly heated room. Painting too early causes stains.

For a house in Bellevue, we follow plastering straight on with painting, using our own team. Tell us about the rooms to transform.

The most common items

Here is what the works can cover. We sort it out together during the visit.

  • Ceilings and technical casings
  • Skim coats and substrate repairs
  • Preparation before painting or covering
  • Partitions and lining walls

For business premises in Bellevue, we plan the work to limit closure.

Frequently asked questions about plastering and partitions in Bellevue

Yes, with a partition. We check the light, the ventilation and the routes for the ducts.

Yes. We first look for the cause, then redo it with tape and filler.

The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.

Boards are quicker and dry straight away. Traditional plaster remains useful on old walls.

How we work in Bellevue

Partitions are built on a metal frame filled with insulation, then closed with plasterboard. The joints are finished in three passes with tape, then sanded.

Wet rooms receive moisture-resistant boards. Ceilings include the access hatches and the planned light fittings.

Planning a project in Bellevue? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in Bellevue

Keep your plans to hand if you have them and note what you would most like to improve. We discuss them during the visit. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française