Before your work, gather the plans and describe the changes you have in mind. If you want to prepare an interior alteration, the structures concerned and the rules for the building must be examined with the planned changes. The structures and objects around the work area must be pointed out so that the protection can be prepared.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Do you live in Epeisses?

Send us a description and two or three photos. The quote is made after seeing the site. You receive a written quote, with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To prepare an interior alteration, your quote request should specify the neighbouring elements to protect and the access to maintain around them. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

The land may be in a building zone, a hamlet zone or an agricultural zone. Each case opens up different possibilities. Outside the building zone, converting an existing volume is sometimes still possible, but the conditions are tighter and the review takes longer.

For a plot in Épeisses, we consult the land register and the zoning plan before drawing anything. This step avoids drawing plans for a project that cannot succeed.

APA or full application (DD), two quite separate routes

Modest work, such as a change to a façade or a small canopy, often follows the fast-track procedure. An extension, an added storey or a change of use generally requires a full application, which is more complete and takes longer to review.

The choice is not made at random. It depends on the nature of the work, the area affected and the impact on the neighbourhood. We tell you the most likely route from the first meeting.

For a farm barn you want to live in, the question is even more specific. The canton looks at whether the volume already exists, whether it keeps its appearance and whether the access and connections follow. A project that is too ambitious on these points risks a refusal that delays everything by several months.

The documents we gather

Site plans and project plans, sections, elevations, photos of the existing building, a description of the materials. For an old farmhouse, the cantonal departments often ask to be shown how the rural character of the building will be respected. Tiles, render colours and the shape of the openings are examined closely.

We prepare the application with a partner architect when the procedure requires it and respond to requests for additional information.

A timescale to build into the project

The review period does not get shorter by insisting. It is wiser to build it into the schedule and order the work that does not depend on it. An interior renovation without external changes can sometimes start while waiting for the answer on the extension. Show us your plot and your idea, and we will tell you which procedure applies.

What the works can include in Epeisses

Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.

  • Identifying the approvals to obtain
  • Checking the scope subject to a permit

Frequently asked questions about building permits in Epeisses

We gather the plans and technical documents with the architect or engineer when one is needed.

The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.

MS Contractor SA coordinates the work with the teams and partner companies planned for the project. Once the permit is granted, you have a single contact for the work.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

How we work in Epeisses

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Epeisses? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

To go further

The simplest way is to call us or fill in the form. We agree on a time to come round. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française