Locality in the canton of Geneva · House, villa and apartment
Earthworks company in Genthod, excavations and trenches
MS Contractor SA studies your earthworks project in Genthod with the existing structures and installations. If you want to prepare an excavation, the layout and dimensions must be examined with the services and the neighbouring structures. The structures and objects around the work area must be pointed out so that the protection can be prepared.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Genthod?
A word about the home and what you want to change is enough to get started. The rest is seen on site. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare an excavation, your quote request should specify the neighbouring elements to protect and the access to maintain around them. Attach the plan and the known information on the services to prepare the excavations and the access. This information helps specify the items in your quote.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
Around the lake, soils can be clayey, mixed with gravel or waterlogged depending on the season. For a basement project or new foundations, a geotechnical study indicates the nature of the ground and the presence of water. It is done before the first bucket of earth.
More pipes and cables often run under a villa lawn than you might imagine. Water, gas, electricity, telephone, drains. The utility plans are requested before the first spadeful.
Access and machines
The width of the access and its load capacity guide the choice of machines. For your plot in Genthod, specify the available access and the plantings to be preserved. The volume to be dug and the means of removal then make it possible to discuss the organisation and the equipment needed.
Trees to be kept are protected. We avoid driving over their roots and mark out an area around the trunk.
Timing matters too. An excavation left open in heavy autumn rain fills quickly and its sides soften. We prefer to start major earthworks in dry weather and backfill quickly.
Banks, shoring and water
A deep excavation must be supported. Depending on the depth and the type of soil, we slope the sides or install shoring. Near an existing house, we monitor the neighbouring foundations so as not to destabilise them.
When water rises at the bottom of the excavation, we pump and drain. Perimeter drainage installed at the right time then protects the buried walls for many years.
Topsoil kept, spoil removed
Part of the topsoil is set aside for the garden. Surplus spoil goes to an approved disposal site. Contaminated material, rare but possible, follows a special disposal channel after analysis.
Backfilling is done in compacted layers with suitable materials. Show us your plot and your project, and we will look together at how to approach it.
Lorries leaving the site must not dirty the roads of Genthod. We clean the wheels and the road at the plot exit whenever necessary.
What the works can include in Genthod
We will not sell you what you do not need. The visit is there precisely to check this.
- Backfilling and preparing the surroundings
- Excavations and levelling
- Preparing foundations and exterior structures
- Routes for underground services
Do you have commercial premises in Genthod? We also work for shops, practices and offices.
Frequently asked questions about earthworks in Genthod
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
Some of it can stay on the plot. The rest goes to landfill according to its quality.
How we work in Genthod
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.
Planning a project in Genthod? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
