Earthworks company in Céligny, excavations and trenches
The available plans and observations help specify your earthworks project in Céligny. If you want to organise the excavation and backfill, the volumes to be moved and the traffic routes are part of preparing the work. Other work planned in the same area may change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Céligny?
Tell us what you want to redo. We come to see the home before pricing anything. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise the excavation and backfill, your quote request should specify the work planned with the other trades and how it connects. Attach the plan and the known information on the utility networks to prepare the excavations and the access. With this information, MS Contractor SA can specify the scope to be priced.
Describing the ground before earthworks
Access and the future use of the land help prepare a first estimate.
- Explain what you want to create and give the approximate dimensions of the area.
- Photograph the slope, the route from the street and the neighbouring buildings.
- Point out known utility networks and any available drainage plans.
On site, the review covers in particular the levels, access and options for removing materials.
The nature of the subsoil and buried networks may require further checks.
Present my projectExamining the ground and access before the work
For an extension or a swimming pool, a trial pit or a geotechnical study gives the nature of the ground and the water level. Depending on the location, you find clay, moraine or silt, and each behaves in its own way once exposed. An excavation in clay ground can collapse without shoring. A high water table requires pumping throughout the work.
We also locate the existing pipes. Water, gas, electricity and waste water often cross gardens without a precise plan.
A digger in an occupied garden
The machine must be able to get onto the plot. We measure the gate and note the trees to protect and the edgings that risk breaking. In the village of Céligny, access sometimes calls for a smaller digger and a little more time. Clean soil is stored to be put back. The surplus goes to a controlled landfill.
Draining and backfilling properly
The protection against water around a basement must be defined with the ground and the construction. Drainage can be considered depending on the water flows and the connection options. The backfill and its compaction are prepared with the structures and surfaces planned above.
On plots close to Lake Geneva, we check where the collected water can be discharged before designing the network.
Digging out for an access or a parking space
A new drive or parking space also starts with digging out. We remove the topsoil, lay a gravel base layer and take care with the fall to drain the rain. On clay soil, a geotextile under the gravel stops the two materials mixing over time.
Show us your plot and the place you want to dig, and we will look together at what the ground allows.
The most common items
The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.
- Preparing foundations and exterior structures
- Routes for underground services
- Backfilling and preparing the surroundings
- Excavations and levelling
Shops and practices in Céligny can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about earthworks in Céligny
The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.
Yes. Temporary retaining work is sometimes needed. We see this during the visit.
Yes. We locate the buried pipes and cables before starting the excavator.
Some of it can stay on the plot. The rest goes to landfill according to its quality.
How we work in Céligny
We ask for the plans of the underground services before setting out the excavation. The topsoil is set aside, then we dig in layers down to firm ground.
The slopes are cut to a stable angle and the bottom of the excavation is levelled. The soil is removed or kept for backfilling.
Planning a project in Céligny? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.