Locality in the canton of Geneva · House, villa and apartment
Underpinning in Céligny
The available plans and observations help specify your underpinning work in Céligny. If you want to prepare a change to the supports, the solution depends on the structural studies and the structures concerned. Other work planned in the same area may change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Céligny?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a change to the supports, your quote request should specify the work planned with the other trades and how it connects. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
In Céligny, the monitoring of the cracks and any trial pits are defined according to the building and the damage observed. The available documents and dated observations help prepare the study. Its duration depends on the checks needed, without a number of weeks set in advance.
The study of a house in Céligny must identify its foundations and their condition. Plans, observations and any investigations make it possible to specify the supports. Their depth cannot be assumed from the age of the building or its address.
Alternating sections, micropiles and injections
The classic method is to dig under the wall in small alternating sections and pour concrete deeper, section after section. A long length of wall is never exposed at once. When firm ground is too far down, we switch to drilled micropiles linked by a transfer beam. Resin injections are sometimes proposed for certain soils. The engineer decides according to what the investigation reveals.
Gaining a basement under an existing house
Turning a crawl space into a cellar or lowering a basement also requires underpinning the foundations. The work proceeds in short stages, with propping and monitoring of the walls. The presence of water in the ground changes a great deal and is checked before anything is decided.
In Céligny, a project close to another building calls for an examination of the rights concerned, the discussions needed and whether a prior condition survey would be useful. These arrangements must be specified before the work. They do not replace the study of the possible effects on neighbouring structures.
Closing the cracks at the right time
Once the structure has been stabilised, the cracks are closed and the renders redone. We wait until everything is stable before the finishes, otherwise they split again. If you notice a crack widening in your home, note the date and photograph it with a tape measure beside it. These images allow us to give an initial opinion.
What the works can include in Céligny
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Strengthening existing structures
- Localised foundation underpinning
- Coordination with the structural study
- Propping and preliminary securing
Shops and practices in Céligny can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about underpinning in Céligny
The underpinning must be defined with the structural and ground study. The temporary arrangements and the stages are designed before the work.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
How we work in Céligny
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Céligny? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.