MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Building permit, APA and application file in Céligny

Before your work, gather the plans and describe the changes you have in mind. If you want to add an outdoor structure, its use, position and dimensions make it possible to prepare the necessary checks. Other work planned in the same area may change the preparation and the sequence of trades.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Is your home in Céligny?

Tell us what you want to redo. We come to see the home before pricing anything. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To add an outdoor structure, your quote request should specify the work planned with the other trades and how it connects. Present the planned changes with the plans and any discussions already under way before the work is scheduled. With this information, MS Contractor SA can specify the scope to be priced.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

Repainting the interior or changing a kitchen does not require anything from the authorities. Opening a window in the façade or extending the house is another matter. A heat pump installed outside, a garden shed or a roof whose appearance changes also fall into this category. Depending on the scale, the project goes through a fast-track procedure or a more complete full application.

At the visit, we examine your project and tell you which route seems most likely. The final decision always rests with the cantonal authorities.

The documents for a well-prepared application

The application brings together the site plan, the floor plans, sections and the elevations before and after the work. Photos of the existing building and a clear description of the materials are attached. For an old house in the village, the authorities may ask for details on colours, tiles or joinery. It is wiser to anticipate these than to supply them after a request for additional information.

We work with architects and draughtsmen who are used to the Geneva forms. You do not have to chase every document.

Neighbours on the other side of the cantonal border

In Céligny, a plot may border a plot in the canton of Vaud. The publication of the application and any objections follow the Geneva rules, but the neighbour is still a neighbour. Presenting the project in person before submission often defuses unnecessary tension. A sketch and a few explanations are generally enough.

While the application is being examined

The timescale depends on the type of procedure and the workload of the office. We follow the application and respond to requests for additional information. At the same time, we prepare the work so that it can start as soon as the permit becomes final. The companies are booked and materials with long lead times are ordered at the right moment.

If you have a project in mind, send us a few photos and a sketch, even a rough one, for an initial look.

What the works can include in Céligny

The visit makes it possible to define the elements concerned and the work the project needs. The quote specifies the chosen work and the elements being kept.

  • Coordination before the works start
  • Identifying the approvals to obtain
  • Checking the scope subject to a permit
  • Preparing the useful technical information

Frequently asked questions about building permits in Céligny

It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.

The stages and timeframes depend on the application. The work schedule is prepared with the formalities and conditions required before starting.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

We gather the plans and technical documents with the architect or engineer when one is needed.

How we work in Céligny

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Céligny? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Start your project

Keep your plans to hand if you have them and note what you would most like to improve. We discuss them during the visit. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française