Locality in the canton of Geneva · House, villa and apartment
Plastering in Gy, partitions, wall linings and false ceilings
For your plasterwork and partition project in Gy, start from the elements to change and those you want to keep. If you want to create an interior partition, the new separation is defined with the uses, the passages and the junctions. Any points still unknown must be identified before a final scope is chosen.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Gy?
Tell us what you want to redo. We come to see the home before pricing anything. You receive a written, no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To create an interior partition, your quote request should specify the confirmed information and the questions to check during the visit. Specify the uses and the junctions with the floors, the walls and the equipment being kept. This information helps specify the items in your quote.
Specifying your partition and ceiling needs
A room may need a new layout, a repair or surface preparation.
- Draw the partitions to create or move and note the approximate height of the rooms.
- Add photos of the ceilings, cracks and existing junctions.
- Specify the equipment to integrate and the planned use of each space.
We examine the substrates, service routes and the finishes you want.
The function of an existing partition must be checked before it is modified.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Decorative paintwork with green and yellow patterns on the walls of a corridor, around a porthole and light-coloured doors.

Interior fit-out with curved partitions, a porthole opening and decorative paintwork with green and yellow patterns.

View of an interior corridor with porthole doors, interior windows and curved partitions in light tones.
Examining the substrates and plasterwork
Creating an extra bedroom, enclosing a study, closing in a mezzanine. Rails, studs and screwed boards form a dry partition built in a day or two. Sound insulation is slipped inside. In damp rooms, moisture-resistant boards are used.
To hang heavy units or a television, we plan reinforcements in the frame before closing the partition. Once the wall is finished, you know exactly where to fix.
False ceilings and attics
A false ceiling makes it possible to hide ducts, recess spotlights or lower a ceiling that is too high. Under a roof structure, we line the slopes after the insulation and vapour barrier have been installed. Care taken over the junctions avoids the cracks that appear when the timber moves.
In converted farmhouse attics, the shapes are rarely simple. Purlins, rafters, dormers. The plasterer cuts and fits each board on site.
Bulging plaster in village houses
In the village, stone walls are often plastered with gypsum or lime. They bulge, they are cracked, they have received several layers of wallpaper. They can be replastered while keeping their slight irregularity, or lined with boards to obtain a straight surface.
A lining must be chosen with the condition of the wall and the moisture conditions. An air gap or a plaster cannot be chosen without checking their compatibility with the construction. Existing marks and junctions must be examined before the wall is closed.
The finish before painting
The joints, the corners and the preparation of the boards follow the instructions for the chosen products. The expected finish and the light in the room guide the level of smoothing. The drying stages are built into the schedule before painting.
In Gy, many renovations combine old rooms and new parts. We make sure the two meet without a visible step. Tell us about your project and we will come and look at the rooms.
The most common items
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Preparation before painting or covering
- Partitions and lining walls
- Ceilings and technical casings
- Skim coats and substrate repairs
Frequently asked questions about plastering and partitions in Gy
A partition can be studied according to the dimensions, the openings, the ventilation and the requirements that apply to the intended use. The partition alone does not confirm that a bedroom can be created.
Yes. We first look for the cause, then redo it with tape and filler.
The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.
Boards are quicker and dry straight away. Traditional plaster remains useful on old walls.
How we work in Gy
Partitions are built on a metal frame filled with insulation, then closed with plasterboard. The joints are finished in three passes with tape, then sanded.
Wet rooms receive moisture-resistant boards. Ceilings include the access hatches and the planned light fittings.
Planning a project in Gy? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
