Locality in the canton of Geneva · House, villa and apartment
Plastering in Jussy, partitions, wall linings and false ceilings
The available plans and observations help specify your plasterwork and partition project in Jussy. If you want to box in services or a volume, the boxing must be prepared with the access to be kept and the junctions with the walls. Scheduling constraints should be stated without presuming the duration of the work.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Jussy?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To box in services or a volume, your quote request should specify the key dates and the periods when access is possible. Specify the uses and the junctions with the floors, the walls and the equipment being kept. This information helps specify the items in your quote.
Specifying your partition and ceiling needs
A room may need a new layout, a repair or surface preparation.
- Draw the partitions to create or move and note the approximate height of the rooms.
- Add photos of the ceilings, cracks and existing junctions.
- Specify the equipment to integrate and the planned use of each space.
We examine the substrates, service routes and the finishes you want.
The function of an existing partition must be checked before it is modified.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Interior fit-out with curved partitions, a porthole opening and decorative paintwork with green and yellow patterns.

Decorative paintwork with green and yellow patterns on the walls of a corridor, around a porthole and light-coloured doors.

View of an interior corridor with porthole doors, interior windows and curved partitions in light tones.
Examining the substrates and plasterwork
A stud partition can be studied with the dimensions and the use of the room. The substrate must be checked against the loads of the system. The services, any insulation and the finishes must be defined before the work is confirmed.
In a bathroom, we use moisture-resistant boards and apply a liquid waterproofing membrane before tiling. To fix a heavy unit or a wall-hung WC, we plan reinforcements in the partition before closing it.
Lining a stone wall without smothering it
Against an old wall, a badly designed lining traps moisture. We leave an air gap or choose vapour-permeable insulation and boards. In some cases, a lime plaster directly on the stone is wiser than a lining.
We always look at the condition of the wall before covering it. An active crack or a damp patch must be understood and dealt with. Once the lining is in place, you can no longer see it, but it carries on.
Ceilings and volumes
Under an exposed roof structure, we create sloping board ceilings between the beams to close in the insulation. The work requires precision around timbers that are never straight. In a villa, a false ceiling can hide ventilation ducts or incorporate spotlights.
For old rooms with moulded ceilings, we repair rather than replace. A plasterer knows how to restore a worn cornice or fill a crack without losing the original design.
Smooth surfaces before the colour
The joints are taped, filled and sanded in several passes. Raking light reveals every irregularity, especially in rooms with large windows facing the fields. We take care with these finishes so that the paint looks right. Explain how you want to rearrange your rooms and we will come and discuss it on site.
What we do in Jussy
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Preparation before painting or covering
- Partitions and lining walls
- Ceilings and technical casings
- Skim coats and substrate repairs
Do you have commercial premises in Jussy? We also work for shops, practices and offices.
Frequently asked questions about plastering and partitions in Jussy
A partition can be studied according to the dimensions, the openings, the ventilation and the requirements that apply to the intended use. The partition alone does not confirm that a bedroom can be created.
Yes. We first look for the cause, then redo it with tape and filler.
The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.
Boards are quicker and dry straight away. Traditional plaster remains useful on old walls.
How we work in Jussy
Partitions are built on a metal frame filled with insulation, then closed with plasterboard. The joints are finished in three passes with tape, then sanded.
Wet rooms receive moisture-resistant boards. Ceilings include the access hatches and the planned light fittings.
Planning a project in Jussy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
