MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Tiler in Jussy, floor and wall tiling

The available plans and observations help specify your tiling installation or renovation project in Jussy. If you want to tile a shower room, the water points and the junctions between the walls are among the elements to prepare with the covering. Scheduling constraints should be stated without presuming the duration of the work.

Our projects
Bathroom floor and wall tiles

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

A project in Jussy?

Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. We give you a no-obligation quote.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To tile a shower room, your quote request should specify the key dates and the periods when access is possible. Specify the surfaces and the junctions to be kept so that the substrate preparation is included in the quote. The quote can then distinguish the work to go ahead with from the options to discuss.

Preparing your tiling project

The choice of tiles is prepared together with the condition of the substrate and the use of the room.

  • State the approximate areas to tile and the existing coverings.
  • Photograph the floors, corners, thresholds and areas exposed to water.
  • Share the formats or styles you would like and the equipment to keep.

The visit is used to examine flatness, junctions and the preparation needed.

Laying over the existing covering is only decided after its condition has been checked.

Present my project

Details for your project

Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Entrance hall with wooden doors, white walls and a tiled floor
Wooden doors in an entrance hall

View of the wooden doors and frames in an entrance hall with white walls and a tiled floor.

Bathroom with a wooden vanity unit, large illuminated mirror and wall-hung toilet
Vanity unit and illuminated mirror

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

Wall-hung toilet and white basin in front of brown tiled walls
Wall-hung toilet and basin

Sanitary fit-out with a wall-hung toilet, white basin and brown tiled wall covering.

Shower and wall-hung toilet between brown tiled walls and light walls
Shower and bathroom coverings

View of a bathroom combining a shower, a wall-hung toilet, brown walls and light wall surfaces.

Request my detailed quote

Examining the substrate before tiling work

The tiler cannot make up for a poor substrate. On a wooden floor that flexes, the joints split and the tiles come loose. We stiffen the floor and lay a suitable board or an uncoupling mat. On an old screed, we check the flatness and the moisture.

In a shower, the waterproofing goes under the tiles, never afterwards. It runs up the walls and continues round the corners. It is invisible once finished, but it is what protects the house.

Porcelain stoneware, terracotta tiles or stone

Porcelain stoneware is strong and easy to maintain. It imitates stone, wood or concrete. For a farmhouse, terracotta floor tiles or natural stone keep the spirit of the place, but they need sealing and a little more upkeep. Large formats mean few joints, provided the floor is very flat.

In the entrance of a country house, we avoid tiles that are too smooth and too light. Soil and grit show quickly and a wet floor becomes slippery.

Outdoor tiling and frost

A tiled terrace goes through frost and thaw. If water gets under the tiles, it can lift them in a single winter. We lay frost-resistant tiles on a screed with a fall and waterproofing, or on pedestals with drainage underneath. Thick slabs laid on pedestals are often simpler to maintain. We also plan a movement joint every few metres and along the walls, so that the slab can move with the temperature changes.

A single contact for the whole room once the permit is granted

In a bathroom, the tiler works after the plumber and before the painter. With us, once the permit is granted, 35 trades work with a single contact. That person organises the order of the work and avoids back-and-forth. Send us your ideas or your samples, and we will come and look at the room and the substrate.

What the works can include in Jussy

Here is what the works can cover. We sort it out together during the visit.

  • Substrate preparation and flatness
  • Waterproofing wet areas
  • Grout, junctions and finishes
  • Floor and wall tiling

Frequently asked questions about tiling in Jussy

Grout suited to water and easy to maintain. We discuss it according to the use of the room.

Yes. They require a very flat substrate. We prepare it before laying.

The plans if you have them, a few photos and a list of what you would like to change. Also tell us how to access the building.

Sometimes yes, if the old ones are well bonded and flat. Otherwise we remove them.

How we work in Jussy

Before laying, we check that the substrate is flat and dry, and we set out the pattern from the centre line of the room. Large formats are laid with adhesive on both the tile and the floor.

In showers, the waterproofing is applied under the tiles. The flexible joints in the corners and the thresholds are finished last.

Planning a project in Jussy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in Jussy

Keep your plans to hand if you have them and note what you would most like to improve. We discuss them during the visit. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française