MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Interior demolition and dismantling in Hermance

Present your removal and demolition project in Hermance with the available plans and the result you want. If you want to organise dismantling before a renovation, the sequence of work must preserve the structures being kept and prepare the work that follows. Distinguish the elements to keep from those that need to be redone.

Our projects
Interior demolition, partitions removed and rubble before rebuilding

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Do you live in Hermance?

A word about the home and what you want to change is enough to get started. The rest is seen on site. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To organise dismantling before a renovation, your quote request should specify the boundaries between the parts being kept and the new work. Distinguish the elements to remove from those to protect, with the plans and the surveys available. This information helps specify the items in your quote.

Defining what needs to be dismantled

Overall photos make it possible to distinguish the elements to remove from those to protect.

  • Identify the partitions, equipment or coverings to remove.
  • State the elements you want to salvage or keep in place.
  • Show the access routes, stairs and spaces available for taking out the materials.

The visit makes it possible to examine the substrates, the neighbouring installations and the protection to plan.

Work on the structure or on suspect materials requires an appropriate assessment before work begins.

Present my project

Identifying the elements to remove and to preserve

For any house built before the 1990s, an amiante survey is required before any demolition. Tile adhesives, some false ceilings, fibre cement sheets or window sealants may contain it. If the survey is positive, an authorised company removes the materials concerned before we continue.

We also look for lead in old paints and for pipes and cables that are still live or under pressure. Everything is cut off and isolated before dismantling.

Dismantling while preserving what remains

If you want to keep a staircase, a surround or a covering, say so before the removal. The protection and the dismantling methods must be adapted to their condition. Any discoveries after opening up may require further checks before continuing.

Despite its fragile appearance, an old partition sometimes carries the load of a floor. Before opening a wall, we check what it supports. If necessary, an engineer comes by and we prop before breaking through.

Interesting elements such as an old door, old tiles or beams can be set aside to be reused later in the house.

Removing waste in a tightly packed village

To prepare the removal of materials, indicate the dimensions of the passages and the possible loading points. The size of the skips and the trips are chosen with the volume to be removed. Shared access and traffic constraints must be planned into the organisation.

Sorting is done directly in front of the house. Wood, metal, mineral rubble, plaster and special materials each go to their own stream.

Noise, dust and neighbours

Terraced houses transmit impacts easily. We inform the neighbours, close off the openings with plastic sheeting and respect the site hours. The cutting equipment has dust extraction to limit dust.

Tell us what you want to remove and what you want to keep. We discuss it on site before setting the duration of this phase.

What we can take care of

This list gives an idea of the work. The exact content depends on what we find on site.

  • Protecting the areas being kept
  • Removing the elements planned in the project
  • Sorting and removing materials
  • Preparing the substrates for what comes next

Shops and practices in Hermance can also entrust us with this type of work. We adapt to their activity.

Frequently asked questions about demolition and dismantling in Hermance

We sort it and remove it to the planned channels. The home is left clean.

The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.

The function of the wall and the services it contains must be identified before removal. Structural work requires the appropriate checks and studies.

In Geneva, an amiante survey before work must be carried out for buildings or parts of buildings built before 1991. The materials concerned are identified before any removal or demolition is started.

How we work in Hermance

Our partners shut off and secure the water, electricity and gas, then we protect what must stay in place. Dismantling goes from top to bottom, ceilings, partitions, then floors.

A load-bearing wall is only opened after propping, following the engineer’s instructions. Materials are sorted by type before removal.

Planning a project in Hermance? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Arrange a visit in Hermance

A call or a message and we set a date for a visit. The visit is prepared according to the areas to examine and the information available. The quote remains no-obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française