MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Underpinning in Hermance

Present your underpinning work in Hermance, distinguishing the priorities and the elements to keep. If you want cracks in a structure to be examined, their location and how they have developed must be described without drawing conclusions about their cause from a photo. A sketch with the known dimensions makes it possible to discuss the expected result more concretely.

Our projects
Structural work, reinforcement of a concrete slab before pouring

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Building work in Hermance?

Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. We give you a no-obligation quote.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To have cracks in a structure examined, your quote request should specify the measurements taken and those that remain to be confirmed on site. Present the available plans and studies to prepare the phasing with the structural specialists. The quote can then distinguish the work to go ahead with from the options to discuss.

Documenting the signs observed before underpinning

A precise description helps prepare the review, without drawing conclusions remotely about their cause.

  • Locate the cracks, movement or subsidence and say when you noticed them.
  • Provide dated photos and any technical reports already available.
  • Describe previous work and the access conditions to the areas affected.

The visit is used to record the visible signs and organise the useful investigations.

The choice of underpinning method depends on an appropriate study of the building and the ground.

Present my project

Preparing the study of the supports and structure

Studying a movement in the building may require checking the supports, the ground and the water inflows. Known incidents on the networks and nearby work are useful to report. The investigations must look for the cause before any underpinning of the foundations is decided.

We always look for the cause before strengthening. Repairing without removing the origin of the movement only postpones the next one.

The engineer’s role

No underpinning is done without a civil engineer. They analyse the cracks, have trial pits dug and define the method. Tell-tales placed on the cracks for a few weeks show whether the movement is active or over.

We work with them from the assessment through to handover. Once the permit is granted, you have only one contact for the technical side and the work on site.

Digging under the wall, stage by stage

The most common method consists of digging under the wall in small alternating stages, then pouring concrete to take the support down to load-bearing ground. A long length is never exposed at once. Each stage hardens before the next one is opened.

When firm ground is deep or water gets in the way, drilled micropiles or injections can be used. Near the lake, temporary pumping is sometimes needed to keep the excavation dry.

During the work, reference points fixed to the walls are read regularly. The slightest movement is detected early.

Gaining height in the basement

Some owners in Hermance want to gain height in a cellar in order to convert it. This is possible, but it requires underpinning all the foundations around the perimeter and treating the waterproofing with care. In a terraced house in the old village, the neighbours' agreement and monitoring of their walls are also needed.

If you see cracks appearing, photograph them with a date. We will come and look at them and tell you whether an engineer needs to be involved.

What we do in Hermance

Here is what the works can cover. We sort it out together during the visit.

  • Strengthening existing structures
  • Localised foundation underpinning
  • Coordination with the structural study
  • Propping and preliminary securing

We also work for businesses in Hermance. Shop, pharmacy or office, the works are organised around opening hours.

Frequently asked questions about underpinning in Hermance

The time needed to prepare the quote is confirmed after the visit, depending on the measurements, the choice of supplies and the trades involved.

This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.

Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.

The underpinning must be defined with the structural and ground study. The temporary arrangements and the stages are designed before the work.

How we work in Hermance

Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.

Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.

Planning a project in Hermance? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Start your project

You can also send us photos before the visit. This helps us come with the right questions. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française