Hamlet in Cartigny · House, villa and apartment
Underpinning in La Petite-Grave
Describe your underpinning work in La Petite-Grave based on your uses and the result you expect. If you want to prepare a change to the supports, the solution depends on the structural studies and the structures concerned. The visit is more useful when the questions and documents have already been gathered.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in La Petite-Grave?
A word about the home and what you want to change is enough to get started. The rest is seen on site. You receive a written quote, with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To prepare a change to the supports, your quote request should specify the points to be examined and the documents available to limit assumptions. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
Clay soils swell in winter and shrink during dry summers. A large tree planted too close draws water from under one corner of the house. A broken pipe soaks the ground in the same place over a long period. The result is stepped cracks in the walls, doors that rub and tiles that split.
Before any work, we have tell-tales placed on the cracks for several weeks. If they are still moving, the movement is active and its cause has to be found.
A wall underpinned section by section
Nobody empties the ground under a wall along its whole length. The wall is underpinned in short sections, spaced apart from one another. We dig under one section, pour the concrete, wait for it to set, then move on to the next. The supports needed and the monitoring must be defined for the stages of the project. Between two passes, we check the tell-tales placed on the cracks to make sure that nothing is moving.
Depending on the soil and the loads, the engineer may prefer micropiles or injections. The choice is made after the ground survey, never by guesswork.
Digging a cellar under a farmhouse
Gaining a level under an old house is possible but heavy work. The foundations have to be taken down below the future floor, the water managed and the new walls waterproofed. In a hamlet, the access for removing the soil counts for a lot. The work is often done with a mini excavator and partly by hand.
What we look at first
Type of cracks and their width, presence of trees, slope of the ground, condition of the drains, nature of the soil if known. We work with a civil engineer who follows each stage. If cracks concern you on your house in La Petite-Grave, send us photos with an object for scale.
The most common items
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Propping and preliminary securing
- Strengthening existing structures
Frequently asked questions about underpinning in La Petite-Grave
The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
MS Contractor SA coordinates the work defined for your project with an identified contact person. The division of the work is specified with the trades concerned.
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
How we work in La Petite-Grave
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in La Petite-Grave? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.