MS Contractor SA

Hamlet in Cartigny · House, villa and apartment

Building permit, APA and application file in La Petite-Grave

Before your work, gather the plans and describe the changes you have in mind. If you want to gather the documents for a project, the plans and a precise description of the changes help identify the missing documents. Scheduling constraints should be stated without presuming the duration of the work.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Let’s talk about your home in La Petite-Grave

Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To bring together the documents for a project, your quote request should specify the important dates and the periods during which access is possible. Present the changes considered with the plans and any discussions already under way before planning the works. This information helps specify the items in your quote.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

The canton’s zoning plan shows whether the land is in an agricultural zone, a hamlet zone or a building zone. This information decides almost everything. In an agricultural zone, the possibilities for extending a building or changing its use are tightly regulated. Elsewhere, the margins are wider but remain subject to rules on size and distance.

We consult the land register and the official plans before drawing anything. A project poorly aligned with the zone can be refused after months of waiting.

What requires a file and what does not

Redoing a bathroom or changing a parquet floor generally does not involve the authorities. Changing the exterior appearance is another matter. A new window in the façade, a change of colour, a roof window, a carport, a boundary wall, a heat pump placed outside. Depending on the scale, we submit a simplified application or a final application.

On old farmhouses, the appearance of the rural buildings is often examined closely. Proportions of the openings, roofing materials, colour of the renders. A file that respects the character of the place moves forward more easily.

Putting the file together

A site plan, the floor plans, a section and the existing and planned façades are needed. We attach photos and the list of planned materials. Depending on the project, an energy compliance document or an engineer’s opinion is added. We prepare these documents with an architect or a draughtsman, then submit the application and answer the questions from the authorities.

During the review, you may be asked for additional information or a change. We adjust the file and send it back without delay.

Anticipating the time frames

A permit takes time, sometimes several months. It is wiser to launch the application early and prepare the work in parallel. Tell us about your idea from the start, even if it is vague. We will quickly tell you whether it holds up on your plot.

What we do in La Petite-Grave

The visit makes it possible to define the useful work and the elements to be kept. Its scope is specified in the quote.

  • Identifying the approvals to obtain
  • Checking the scope subject to a permit

We also work for shops in La Petite-Grave. Shop, pharmacy or office, the work is organised around opening hours.

Frequently asked questions about building permits in La Petite-Grave

The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.

It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

We gather the plans and technical documents with the architect or engineer when one is needed.

How we work in La Petite-Grave

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in La Petite-Grave? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in La Petite-Grave

Keep your plans to hand if you have them and note what you would most like to improve. We discuss them during the visit. Your quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française