Underpinning in Malval

For your underpinning work in Malval, start from the elements to change and those you want to keep. If you want to have cracks in a structure examined, the location and development of the cracks must be described without drawing conclusions about their cause from a photo. The relevant stages depend on the scope and the links between the different jobs.

Our projects
Structural work, reinforcement of a concrete slab before pouring

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Do you live in Malval?

A word about the home and what you want to change is enough to get started. The rest is seen on site. You receive a written quote, with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To have cracks in a structure examined, your quote request should specify the other work your project depends on and the limits of each job. Present the available plans and studies to prepare the phasing with the structural specialists. The quote can then distinguish the work to go ahead with from the options to discuss.

Documenting the signs observed before underpinning

A precise description helps prepare the review, without drawing conclusions remotely about their cause.

  • Locate the cracks, movement or subsidence and say when you noticed them.
  • Provide dated photos and any technical reports already available.
  • Describe previous work and the access conditions to the areas affected.

The visit is used to record the visible signs and organise the useful investigations.

The choice of underpinning method depends on an appropriate study of the building and the ground.

Present my project

Preparing the study of the supports and structure

A crack that follows the stone joints, a stable door that sticks, tiles coming loose on a diagonal. These signs do not always have the same cause. A clay soil that dries out after a dry summer, a leaking pipe that washes out the ground, a tree too close whose roots draw up the water. Gauges glued across the cracks show, week after week, whether they are still opening.

A civil engineer analyses everything and sizes the underpinning. Without this assessment, there is a risk of treating the symptom rather than the cause.

Concrete sections poured in a staggered pattern

The most common technique consists of digging under the wall in short sections, never side by side. Concrete is poured into each section and left to harden, then the next one is tackled, skipping one each time. At no point is the wall left unsupported. It is slow, but it is what protects the house.

On some ground, drilled micropiles that reach a deeper load-bearing layer are preferred. The choice depends on the soil and the loads.

Digging a cellar under a farmhouse

Some owners want to gain a level by lowering the floor of an old stable or storeroom. The foundations then need to go deeper than the new floor, the buried walls must be waterproofed and drainage provided. The presence of water in the ground at that depth is also checked. The work is often done by hand or with very small machines, because the headroom under the old floors is low.

Monitoring and checks

Throughout the work, the cracks and levels are monitored. Adjoining neighbours are informed, and a record of the condition of their house is drawn up before work begins. If you see cracks appearing or are thinking of digging under your house, let us talk about it early.

What the works can include in Malval

The visit makes it possible to define the useful work and the elements to be kept. Its scope is specified in the quote.

  • Propping and preliminary securing
  • Localised foundation underpinning

Frequently asked questions about underpinning in Malval

The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.

This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.

Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.

The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.

How we work in Malval

Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.

Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.

Planning a project in Malval? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in Malval

You can also send us photos before the visit. This helps us come with the right questions. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.