Hamlet in Dardagny · House, villa and apartment
Building permit, APA and application file in Malval
Before your work, gather the plans and describe the changes you have in mind. If you want to add an outdoor structure, its use, position and dimensions make it possible to prepare the necessary checks. The maintenance options are discussed with the planned use and the finishes being considered.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Malval
Tell us what you want to redo. We come to see the home before pricing anything. We give you a no-obligation quote.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To add an outdoor structure, your quote request should specify the maintenance you want to be able to carry out once the work is finished. Present the planned changes with the plans and any discussions already under way before the work is scheduled. With this information, MS Contractor SA can specify the scope to be priced.
Gathering the documents for your transformation
The procedure to consider depends on the building and the exact nature of the project.
- Describe the changes you want, distinguishing the interior, the openings and the surroundings.
- Send the existing plans and the building documents you have.
- Mention any discussions already under way with the property management agency, the co-owners or the authorities.
We review the project and the missing information to identify the checks to carry out.
The procedures and decisions required remain to be confirmed with the competent bodies.
Present my projectDescribing the changes before the permit procedures
The first check concerns the zoning of the land. A hamlet may be classified as a building zone, an agricultural zone or a hamlet zone with its own rules. This classification changes everything. In an agricultural zone, converting a non-agricultural building into housing is very strictly regulated and sometimes impossible.
We consult the land register and the zoning plans before drawing anything. This step seems administrative. Yet it decides whether the project is feasible.
APA for small works, DD for the rest
In Geneva, small works go through a simplified procedure, the APA. Replacing windows with a different model, adding a roof window, installing a heat pump or building a garden shed often fall into this category. Larger projects, such as an extension or a change of use, require a final permit, which takes longer.
The file includes plans, sections, photos of the existing building and a description of the materials. For an old façade, the colours and renders are specified. The cantonal departments look closely at how the project fits into the landscape.
The neighbours and the departments consulted
An application is published and the neighbours can submit observations. In a small hamlet where everyone knows each other, presenting the project before submitting it often defuses tensions. We advise you on how to do this.
Depending on the project, several departments give their opinion. Energy, heritage, agriculture, water. Each can ask for additional information. We respond to these requests and adjust the plans without losing sight of what you want to build. A refusal is not always final. A project revised on the points criticised can be resubmitted.
The file put together on our side
Survey of the existing building, plans with a partner architect when necessary, forms, follow-up of the file until the decision. Once the permit is obtained, the work can follow without changing contact person. Send us the address and a few photos, and we will first look at what the plot allows.
What we do in Malval
Here is what the works can cover. We sort it out together during the visit.
- Identifying the approvals to obtain
- Preparing the useful technical information
Frequently asked questions about building permits in Malval
We gather the plans and technical documents with the architect or engineer when one is needed.
It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.
MS Contractor SA coordinates the work defined for your project with an identified contact person. The division of the work is specified with the trades concerned.
Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.
How we work in Malval
Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.
The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.
Planning a project in Malval? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.
