MS Contractor SA

Hamlet in Meyrin · House, villa and apartment

Building permit, APA and application file in Mategnin

Before your work, gather the plans and describe the changes you have in mind. If you want to gather the documents for a project, the plans and precisely described changes help identify the missing items. A localised job and a more extensive repair do not correspond to the same scope.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

A project in Mategnin?

Tell us what you want to redo. We come to see the home before pricing anything. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To gather the documents for a project, your quote request should specify the parts affected and the result you expect so that the possible solutions can be examined. Present the planned changes with the plans and any discussions already under way before the work is scheduled. This information helps specify the items in your quote.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

Replacing a window like for like in a house often requires no formalities. Altering a facade, creating a dormer, extending, enclosing a carport or converting a barn into a home is another matter. This work affects the appearance of the building or its use.

Outside the ordinary building zone, the possibilities for extension are more tightly regulated. So we start by checking the status of the plot on the official plans before promising anything.

Two cantonal procedures, two levels of requirement

The canton distinguishes between the accelerated procedure, suited to modest work, and the final application for larger projects. The choice depends on the nature of the work and not on the wishes of the applicant. A file sent down the wrong route often comes back with requests for additional information.

Timescales vary a great deal. You need to allow several weeks at the very least, sometimes much longer when several departments give their opinion. We build this wait into the schedule so that the work does not start on an assumption.

What we prepare with you

Plans of the existing building and the project, sections, photos, a description of the materials, colours of the facades and roofs. For an old house, the current condition is carefully documented. The cantonal departments appreciate understanding what is kept and what changes.

We work with architects and draughtsmen used to these procedures. Once the permit is granted, you keep a single contact for the work.

Neighbours are informed through the publication of the application in the Official Gazette (Feuille d’avis officielle). A project explained to the residents beforehand generally goes through more smoothly.

After the green light

The permit sets conditions that must be respected on site. Approved colour, required materials, water management, sometimes tree protection. We pass them on to each team concerned. If you have a project in mind for your house in Mategnin, describe it to us and we will look together at the right procedure.

What we do in Mategnin

Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.

  • Identifying the approvals to obtain
  • Checking the scope subject to a permit

For professional premises in Mategnin, the work is planned so as to limit closure.

Frequently asked questions about building permits in Mategnin

It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.

It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

We gather the plans and technical documents with the architect or engineer when one is needed.

How we work in Mategnin

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Mategnin? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

To go further

The simplest way is to call us or fill in the form. We agree on a time to come round. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française