Hamlet in Jussy · House, villa and apartment
Tiler in Monniaz, floor and wall tiling
Present your tiling installation or renovation project in Monniaz, distinguishing the priorities and the elements to keep. If you want to redo a tiled floor, the substrate and the thresholds need to be examined before the new installation is specified. Known earlier work can help in understanding the structures and the limits of the repairs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Monniaz
A word about the home and what you want to change is enough to get started. The rest is seen on site. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To redo a tiled floor, your quote request should specify any known earlier work and the documents you have. Specify the surfaces and the junctions to be kept so that the substrate preparation is included in the quote. This information helps specify the items in your quote.
Preparing your tiling project
The choice of tiles is prepared together with the condition of the substrate and the use of the room.
- State the approximate areas to tile and the existing coverings.
- Photograph the floors, corners, thresholds and areas exposed to water.
- Share the formats or styles you would like and the equipment to keep.
The visit is used to examine flatness, junctions and the preparation needed.
Laying over the existing covering is only decided after its condition has been checked.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

View of the wooden doors and frames in an entrance hall with white walls and a tiled floor.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of the sanitary fixtures and brown tiled walls of a bathroom whose fittings are being installed.

Sanitary fit-out with a wall-hung toilet, white basin and brown tiled wall covering.
Examining the substrate before tiling work
An old floor laid on the ground can bring up moisture. A timber floor flexes underfoot. No tiling lasts long on this kind of base. Flatness, strength and moisture are checked first.
Depending on the case, a new screed is poured, the floor is strengthened or uncoupling boards are laid. These mats are chosen according to the permissible movements of the substrate and the installation system. Their compatibility must be checked before laying.
Bathroom and walk-in shower
In a wet room, the waterproofing goes under the tiles. A liquid membrane or a waterproof mat is applied to the walls and floor, with tapes in the corners and around each penetration. A walk-in shower requires an even fall towards the channel drain.
Large formats are popular, but an old floor that is rarely flat copes poorly with them. The size of the tiles is adapted to the actual substrate.
Keeping or reproducing the old
Cement tiles that are still attractive can be lifted, cleaned and relaid in another room. Terracotta floor tiles are restored by sanding and oil treatment. When some are missing, we look for reclaimed pieces or handmade tiles close to the original.
Natural stone paving suits a farmhouse entrance or a converted old stable well. It ages well and copes with comings and goings from the garden.
Centring the pattern, choosing the joint
The laying plan is drawn on paper long before the adhesive is mixed. The pattern is centred, small cuts against a door are avoided and the joints between floor and walls are aligned. The joints themselves are chosen according to the use, cement-based in dry rooms and epoxy in a shower.
If you are hesitating between keeping an old floor in Monniaz or replacing it, we can come and look at it. Sometimes cleaning it is enough to change your mind.
The most common items
Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.
- Substrate preparation and flatness
This service also covers shops, pharmacies and offices in Monniaz.
Frequently asked questions about tiling in Monniaz
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
Yes. They require a very flat substrate. We prepare it before laying.
The adhesion and flatness of the existing tiles must be checked along with the compatibility of the installation system and the available levels. These points guide whether they are kept or removed.
Grout suited to water and easy to maintain. We discuss it according to the use of the room.
How we work in Monniaz
Before laying, we check that the substrate is flat and dry, and we set out the pattern from the centre line of the room. Large formats are laid with adhesive on both the tile and the floor.
In showers, the waterproofing is applied under the tiles. The flexible joints in the corners and the thresholds are finished last.
Planning a project in Monniaz? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.
