Hamlet in Chancy · House, villa and apartment
Laying and replacing drainage pipes in Passeiry
The available plans and observations help specify your pipework project in Passeiry. If you want to adapt a plumbing connection, the new fixture must be considered with the existing waste pipe and the available routes. Other work planned in the same area may change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Do you live in Passeiry?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To adapt a plumbing connection, your quote request should specify the work planned with the other trades and how it connects. Point out the areas concerned and the visible pipes to prepare the checks and the access. With this information, MS Contractor SA can specify the scope to be priced.
Locating your drainage needs
The signs and the location of the equipment guide the first checks.
- State the drains concerned and describe any leaks, odours or slow drainage.
- Photograph the visible joints and send the network plan if you have one.
- Say whether it happens all the time or only with certain uses.
We examine the accessible parts to determine the checks and work to consider.
The condition of hidden pipes cannot be deduced from photos alone.
Present my projectDefining the useful checks on the drainage
The existing network must be traced using the plans and the accessible structures. For roof water and waste water, their routes and outfalls must be identified. Any adaptations are defined with the regulations and the connection options for the project.
A camera inspection of the pipes shows the actual condition of the network. Roots, subsidence, displaced joints, everything appears on screen. We then know what can be repaired and what must be replaced.
Laying a pipe in country ground
A new pipe is laid in a trench with a regular fall, on a bed of fine gravel, then surrounded before backfilling. PVC or polyethylene pipes replace the old cement ones. Inspection chambers allow cleaning at changes of direction.
In Passeiry, the clay farmland retains water around the pipes. Careful compaction around the pipe prevents it from deforming or sinking when a vehicle passes over it.
Rainwater and drainage
The large roofs of farmhouses collect a lot of water. If the ground allows, it can soak away on the plot in a soakaway or an infiltration trench. Otherwise, it goes to the rainwater network. Around buried walls, a drain encircles the house and carries away the water that pushes against the foundations.
A collection tank for watering the garden can easily be connected during this work. The overflow is connected to the infiltration system or to the network.
A connection made by the rules
Any new connection to the public network requires a permit and an inspection. We prepare the drainage plan and coordinate with the departments concerned. For a house in Passeiry whose drainage is causing trouble, tell us where the water is standing and for how long, as that already guides the search.
The work possible in Passeiry
Every home is different. The quote only includes the useful items once the actual condition has been seen.
- Water supply to the home
- Drainage from kitchens and bathrooms
Frequently asked questions about drainage in Passeiry
A camera inspection can provide information on the internal condition of an accessible pipe. It depends on the access and cannot assess everything on its own.
Not always. Some pipes can be repaired from the inside. The camera helps decide.
In many parts of the canton it is required when work is carried out. We check what applies to your property.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Passeiry
We locate the route of the pipes, with a camera when needed, then open the trench with the right slope. Waste water and rainwater are laid separately, on a bed of sand.
Inspection chambers allow checks and maintenance. A flow test is carried out before backfilling, which is compacted in layers.
Planning a project in Passeiry? MS Contractor SA, a general building contractor in Geneva, works in houses, villas and apartments, with a no-obligation quote.