Hamlet in Chancy · House, villa and apartment
Underpinning in Passeiry
Present your underpinning work in Passeiry, distinguishing the priorities and the elements to keep. If you want to organise structural repairs, the phasing and protection are defined with the specialists and the necessary studies. A sketch with the known dimensions makes it possible to discuss the expected result more concretely.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Passeiry
Tell us what you want to redo. We come to see the home before pricing anything. Your quote is no-obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To organise structural repairs, your quote request should specify the measurements taken and those that remain to be confirmed on site. Present the available plans and studies to prepare the phasing with the structural specialists. This information helps specify the items in your quote.
Documenting the signs observed before underpinning
A precise description helps prepare the review, without drawing conclusions remotely about their cause.
- Locate the cracks, movement or subsidence and say when you noticed them.
- Provide dated photos and any technical reports already available.
- Describe previous work and the access conditions to the areas affected.
The visit is used to record the visible signs and organise the useful investigations.
The choice of underpinning method depends on an appropriate study of the building and the ground.
Present my projectPreparing the study of the supports and structure
In Passeiry, as in the other hamlets, old buildings sometimes rest on very shallow foundations. A few courses of stone laid on the earth. When the clay dries out during a hot summer and then swells again, the wall follows these movements. A tree planted too close, a leaking pipe or a neighbouring excavation can make the situation worse.
Before deciding anything, a civil engineer examines the cracks, their width and how they develop. Gauges installed over a few months show whether the movement is continuing or whether it is old and has stabilised.
Digging under the wall every other section
Underpinning may require successive operations under the foundations. Their length, their order and the time between stages are determined by the structural and soil study. Temporary supports and checks are prepared before the excavation. Concreting in sections is one option to compare with other techniques suited to the building.
Depending on the soil, other solutions exist. Drilled micropiles, resin injections under the footing, a reinforced concrete ground beam linking several points. The choice depends on the study and the access around the house.
Deepening an old cellar
You want to increase the height of a cellar in Passeiry. The project must examine the foundations, the levels and the ground conditions before any underpinning is defined. Moisture management and the junctions with the floors are also among the points to study.
A project that is closely monitored
The floors and the roof structure are propped before digging. Markers are placed on the façades and checked regularly. The work is preferably done outside very rainy periods. For a house that shows cracks in Passeiry, start by sending us photos with a tape measure held against the crack. We will see whether it is necessary to go further with an engineer.
The work possible in Passeiry
This list gives an idea of the work. The exact content depends on what we find on site.
- Propping and preliminary securing
- Strengthening existing structures
Do you have commercial premises in Passeiry? We also work for shops, practices and offices.
Frequently asked questions about underpinning in Passeiry
The method depends on the assessment of the building and the ground as well as the structural study. Underpinning in sections may be considered according to the measures defined for the project.
The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.
This must be checked before the works. Whether you can stay in the house depends on the planned work, the access and the safety measures defined for the project. Describe your situation in your quote request so that this question is studied before the organisation is set.
Cracks that widen or doors that rub are signs. An engineer confirms the diagnosis.
How we work in Passeiry
Underpinning is carried out under the direction of an engineer. We prop, then dig under the foundations in short alternating sections.
Each section is concreted before the next one is opened. The building stays supported at every stage, and its movements are monitored during the work.
Planning a project in Passeiry? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
