MS Contractor SA

Hamlet in Satigny · House, villa and apartment

Building permit, APA and application file in Peissy

Before your work, gather the plans and describe the changes you have in mind. If you want to prepare an interior alteration, the structures concerned and the building rules must be examined together with the changes considered. The necessary work and the options you want to compare are worth presenting separately.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

A project in Peissy?

Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. We give you a no-obligation quote.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To prepare an interior alteration, your quote request should specify the priority items and the options to be studied separately. Present the changes considered with the plans and any discussions already under way before planning the works. This information helps specify the items in your quote.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

Redoing a kitchen or changing a parquet floor is generally done without a file. Everything changes as soon as the exterior appearance or the volume is affected. A new window in the façade, a dormer, a conservatory, clearly visible solar panels, a carport, a boundary wall. A change of use of a room, for example an old cellar converted into a bedroom, also falls within this framework.

The zone in which the plot lies carries a lot of weight. Between a hamlet perimeter and agricultural land, the possibilities for extension vary greatly. We check this point before drawing anything, so as not to build a project on a false assumption.

Putting together a file the canton can read

The file brings together a site plan, the plans of the existing building and of the project, the sections, the elevations and the description of the materials. Photos of the current house help a lot for an old building. Depending on the case, an energy compliance document or elements relating to fire protection are added.

When the procedure requires the signature of a recognised authorised professional, we work with architects used to Geneva files. Our team prepares the technical part, the one that describes concretely how the work will be carried out.

Working with the landscape of the Mandement

The cantonal departments look at how the project fits into the hamlet and the vineyard. Colour of the renders, shape of the roof, size of the openings, height of the low walls. In Peissy, as in the other wine-growing hamlets, a project that follows the proportions of the neighbouring houses goes through more easily than a sharp break.

In practice, this often leads to restrained choices. Tiles close to the existing ones, wooden shutters, vertical windows in the old façades, renders in earthy tones.

Allowing for the administrative time

Between submission and decision, several weeks go by, more if the canton asks for additional information. We build this delay into the schedule so that the team starts as soon as approval is received. Send us a sketch or a few photos, we will tell you which procedure seems necessary for your project in Satigny.

The most common items

Not everything is necessarily needed at your home. We only keep what is useful after seeing the premises.

  • Preparing the useful technical information

Frequently asked questions about building permits in Peissy

The time needed to prepare the quote depends on the checks required and the trades involved. It becomes clearer with the information gathered during the visit and any details still to be provided.

It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.

Anything that affects the façade, the structure, the exterior appearance or the use of the premises. A simple interior renovation is often exempt.

We gather the plans and technical documents with the architect or engineer when one is needed.

How we work in Peissy

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Peissy? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Book an appointment in Peissy

Keep your plans to hand if you have them and note what you would most like to improve. We discuss them during the visit. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française