Locality in the canton of Geneva · House, villa and apartment
Plumbing and bathroom installations in Plan-les-Ouates with our partners
The available plans and observations help specify your plumbing project in Plan-les-Ouates. If you want to reorganise a shower room, the layout of the fixtures must be examined with the supplies and drains. Other work planned in the same area can change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Plan-les-Ouates?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. The quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To reorganise a shower room, your quote request should specify the work planned with the other trades and how it connects. Indicate the fixtures to move and the coverings to keep so that the connections can be prepared. This information helps specify the items in your quote.
Defining your plumbing project
The expected uses make it possible to prepare the layout before choosing the fixtures.
- State the fixtures to replace, move or add.
- Photograph the whole room, then the visible supply and waste pipes.
- Explain how you would like to use the room and attach a dimensioned plan if you have one.
The visit makes it possible to check the possible layouts and the accessible connections.
Moving a fixture depends in particular on the networks and the configuration of the space.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of the sanitary fixtures and brown tiled walls of a bathroom whose fittings are being installed.

Sanitary fit-out with a wall-hung toilet, white basin and brown tiled wall covering.

View of a bathroom combining a shower, a wall-hung toilet, brown walls and light wall surfaces.
Examining the plumbing installations and connections
Old galvanised steel pipes scale up and rust from the inside. The water runs brownish at first and the flow drops. Old cast iron or PVC drains can also leak at the joints.
So when we open up a bathroom, our partner plumber replaces the pipes back to the manifold or to the riser. New multilayer or stainless steel pipes last a long time and limit the number of joints.
Replacing the bathtub with a shower
Replacing the bath with a shower comes up in almost every visit. A level-access shower is more practical and safer with age. It needs a drain low enough to keep the fall. In a villa, the drain is often lowered into the crawl space or the cellar. In an apartment, the screed height sometimes limits the options.
We check this from the first visit. If there is not enough fall, a slight step or an ultra-flat shower tray remains a neat solution.
Waterproofing, the step nobody sees
Before tiling, we apply a liquid or sheet waterproofing to the floor and walls of the shower. In the corners and around each pipe, a reinforced tape strengthens the membrane. This work is what protects the neighbour’s ceiling or the room below.
In a co-ownership (PPE), water damage quickly becomes a matter for the whole co-ownership. We never skimp on this step.
Hot water and coordination
With our partners, an old electric water heater can be replaced with a heat pump water heater. It goes in the cellar or the laundry room. A water softener is also worth discussing, as Geneva water leaves limescale on the taps.
In a bathroom, the plumber, electrician, tiler and painter follow one another over a few weeks. We coordinate this sequence for you. Describe your current bathroom in Plan-les-Ouates and what you expect from the new one.
What the works include
Depending on the age of the building and its condition, some items drop out and others are added.
- Taps and sanitary equipment by our partners
- Tests by our partners before the casings are closed
- Showers, baths, washbasins and WCs by our partners
- Supply and drainage by our partners
Shops and practices in Plan-les-Ouates can also entrust us with this type of work. We adapt to their activity.
Frequently asked questions about plumbing installations in Plan-les-Ouates
For a complete renovation, allow a few weeks. A toilet can be kept in service if the home has only one.
Often yes. The gradient of the drain needs checking. We check it during the visit.
Yes, when they are old, our partner plumber replaces them. It is the right time, since the walls are open.
We look at the rooms concerned, take measurements and listen to what you want. The quote then follows in writing.
How we work in Plan-les-Ouates
The existing risers and drains determine where the fittings can go. Our partner plumber lays the supplies and the waste pipes with the right slope, then pressure-tests them before closing the walls.
The waterproofing of the shower areas is done before tiling. Our partners install the fittings and taps last, then adjust them.
Planning a project in Plan-les-Ouates? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
