Hamlet in Jussy · House, villa and apartment
Plastering in Sionnet, partitions, wall linings and false ceilings
The scope of your plastering and partition work in Sionnet is defined with your needs and the existing structures. If you want to box in services or enclose a space, the boxing must be prepared with the access to be kept and the junctions with the walls. The structures and equipment you want to keep must be identified to delimit the repairs.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Is your home in Sionnet?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. You receive a written quote, with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To box in services or enclose a space, your quote request should specify the finishes to keep and those you want to match. Specify the uses and the junctions with the floors, the walls and the equipment being kept. This information helps specify the items in your quote.
Specifying your partition and ceiling needs
A room may need a new layout, a repair or surface preparation.
- Draw the partitions to create or move and note the approximate height of the rooms.
- Add photos of the ceilings, cracks and existing junctions.
- Specify the equipment to integrate and the planned use of each space.
We examine the substrates, service routes and the finishes you want.
The function of an existing partition must be checked before it is modified.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Interior fit-out with curved partitions, a porthole opening and decorative paintwork with green and yellow patterns.

Decorative paintwork with green and yellow patterns on the walls of a corridor, around a porthole and light-coloured doors.

View of an interior corridor with porthole doors, interior windows and curved partitions in light tones.
Examining the substrates and plasterwork
Old farm buildings offer large volumes that need to be divided into bedrooms, wet rooms and storage. Plasterboard partitions on a metal framework make it possible to do this quickly and lightly, without overloading the old floors. Mineral wool is incorporated for sound insulation between the rooms.
For a wet room, moisture-resistant boards are used and waterproofing is planned under the tiles.
Damp stone behind the board
Against an old wall, a ventilated air gap is left or a vapour-permeable lining is chosen. Plasterboard bonded directly onto damp stone eventually goes mouldy. Sometimes the wisest course is to do without a lining and apply a lime or gypsum-lime plaster directly to the masonry.
If a lining is still needed to run conduits, an independent framework set a few centimetres away from the wall is chosen. The stone continues to dry behind it, and an access hatch is kept at sensitive points to monitor the condition of the wall.
Ceilings between beams and false ceilings
Under old floors, the ceilings are often lath and plaster between the joists, sometimes cracked or sagging. They can be consolidated or replaced, or a false ceiling can be installed to hide the services. If the beams are attractive, they are left exposed and only the infill panels between them are treated.
In converted lofts, the plasterwork follows the slopes of the roof structure. It forms the inner facing of the insulation, with a vapour barrier laid without interruption behind the boards.
Finishes ready for the painter
The tape, the skimming and the sanding determine the final appearance. A surface intended for matt paint under low-angled light requires a full skim. We discuss this with you according to the lighting of each room. For a project in Sionnet, send us a sketch of the layout you have in mind.
What we do in Sionnet
Here is what the works can cover. We sort it out together during the visit.
- Ceilings and technical casings
This service also covers shops, pharmacies and offices in Sionnet.
Frequently asked questions about plastering and partitions in Sionnet
It depends on what is affected. Façade, structure, services or common parts often require a procedure. We check before starting.
Yes. We first look for the cause, then redo it with tape and filler.
Boards are quicker and dry straight away. Traditional plaster remains useful on old walls.
Yes, with a partition. We check the light, the ventilation and the routes for the ducts.
How we work in Sionnet
Partitions are built on a metal frame filled with insulation, then closed with plasterboard. The joints are finished in three passes with tape, then sanded.
Wet rooms receive moisture-resistant boards. Ceilings include the access hatches and the planned light fittings.
Planning a project in Sionnet? MS Contractor SA, a building and construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
