Locality in the canton of Geneva · House, villa and apartment
Tiler in Vernier, floor and wall tiling
Describe your tiling installation or renovation project in Vernier based on your uses and the expected result.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
A project in Vernier?
State the type of home and the rooms concerned. The visit then makes it possible to set the content of the quote. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
If you want to redo a tiled floor, the substrate and the thresholds should be examined before the new installation is specified. Your habits of use help describe the expected result and the points to improve.
To redo a tiled floor, your quote request should specify the current uses and what you would like to make more practical.
Specify the areas and the junctions to keep so that the substrate preparation is included in the quote. This information helps specify the items in your quote.
Preparing your tiling project
The choice of tiles is prepared together with the condition of the substrate and the use of the room.
- State the approximate areas to tile and the existing coverings.
- Photograph the floors, corners, thresholds and areas exposed to water.
- Share the formats or styles you would like and the equipment to keep.
The visit is used to examine flatness, junctions and the preparation needed.
Laying over the existing covering is only decided after its condition has been checked.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

View of the wooden doors and frames in an entrance hall with white walls and a tiled floor.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

Sanitary fit-out with a wall-hung toilet, white basin and brown tiled wall covering.

View of a bathroom combining a shower, a wall-hung toilet, brown walls and light wall surfaces.
Checking flatness before large formats
The preparation must meet the requirements of the tile and the installation system. An adhesive is not meant to make up for unevenness in the substrate without limit.
Moisture, cohesion and any cracks should also be examined. The treatment chosen depends on the nature of the existing floor.
Defining the laying direction and the cuts
The layout plan consists of distributing the tiles and joints before installation. It takes into account the walls, the doors and the most visible areas.
The format does not do away with joints. Their width and the movement joints must respect the characteristics of the site and the applicable specifications.
Planning access and timescales
Mention the stairs, the dimensions of the lift and any narrow passages. This information helps assess the handling options.
The times before walking on and using the floor depend on the products, the substrate and the site conditions. They must be built into the schedule before the furniture is brought back.
What the works include
This list gives an idea of the work. The exact content depends on what we find on site.
- Floor and wall tiling
- Substrate preparation and flatness
- Waterproofing wet areas
- Grout, junctions and finishes
We also work for businesses in Vernier. Shop, pharmacy or office, the works are organised around opening hours.
Frequently asked questions about tiling in Vernier
MS Contractor SA can study your tiling project. Send the format you have in mind, the surfaces concerned and the access constraints to prepare the request.
No. Rectification does not remove the need for the joints set out in the installation specifications. The width depends in particular on the tiles and the site conditions.
It helps check the cuts, the orientations and the junctions between rooms. It also makes it possible to estimate the quantities with wastage suited to the chosen pattern.
How we work in Vernier
Before laying, we check that the substrate is flat and dry, and we set out the pattern from the centre line of the room. Large formats are laid with adhesive on both the tile and the floor.
In showers, the waterproofing is applied under the tiles. The flexible joints in the corners and the thresholds are finished last.
Planning a project in Vernier? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
