Locality in the canton of Geneva · House, villa and apartment
Plastering in Vernier, partitions, wall linings and false ceilings
For your plastering and partition project in Vernier, start from the elements to change and those you want to keep. If you want to box in services or a volume, the boxing must be prepared with the access points to keep and the junctions with the walls. Points still unknown must be identified before a final scope is chosen.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Let’s talk about your home in Vernier
Send us a description and two or three photos. The quote is made after seeing the site. Your quote comes with no obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To box in services or a volume, your quote request should specify the confirmed information and the questions to check during the visit. Specify the uses and the junctions with the floors, walls and equipment being kept. This information helps specify the items in your quote.
Specifying your partition and ceiling needs
A room may need a new layout, a repair or surface preparation.
- Draw the partitions to create or move and note the approximate height of the rooms.
- Add photos of the ceilings, cracks and existing junctions.
- Specify the equipment to integrate and the planned use of each space.
We examine the substrates, service routes and the finishes you want.
The function of an existing partition must be checked before it is modified.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Interior fit-out with curved partitions, a porthole opening and decorative paintwork with green and yellow patterns.

Decorative paintwork with green and yellow patterns on the walls of a corridor, around a porthole and light-coloured doors.

View of an interior corridor with porthole doors, interior windows and curved partitions in light tones.
Examining the substrates and plasterwork
Rethinking the layout of a home is a frequent request. Creating an extra bedroom in a large living room, closing off a study, enlarging a bathroom. Plasterboard partitions on metal studs go up quickly, with no water and no long drying time. We fit mineral wool inside to reduce noise from one room to the next.
For plastering work in Vernier, the walls and slabs are examined before the fixings are chosen. The junctions and any acoustic measures depend on the construction and the expected use of the partition.
Hiding ducts and beams in the ceiling
Hanging below the old one, the new ceiling hides a ventilation duct, cables or a beam. It makes it possible to recess spotlights and to correct an uneven ceiling. We keep sufficient headroom and plan access hatches to reach the valves and junction boxes.
In an open kitchen, a bulkhead above the island defines the space and houses the cooker hood. It is a detail that changes how the room reads.
Old walls, plasters and cracks
Older villas sometimes have walls covered with a traditional plaster that sounds hollow in places. We remove the detached areas and redo them with a compatible plaster. Fine cracks in the ceiling, common at the board joints, are opened up and then reinforced with tape before being filled. Without tape, they come back.
After old wallpaper has been removed, the wall is often marked. A smoothing plaster over the whole surface gives a clean base for the paint.
Converted lofts
Under the roof, we line the sloping ceilings with boards fixed to the framework, after the insulation and vapour barrier have been installed. The joints are treated with care, as lofts undergo strong temperature variations. We plan moisture-resistant boards around the shower room. Describe the room to be converted and we will come and take the measurements.
The work possible in Vernier
Depending on the age of the building and its condition, some items drop out and others are added.
- Skim coats and substrate repairs
- Preparation before painting or covering
- Partitions and lining walls
- Ceilings and technical casings
Do you have commercial premises in Vernier? We also work for shops, practices and offices.
Frequently asked questions about plastering and partitions in Vernier
Yes, with a partition. We check the light, the ventilation and the routes for the ducts.
The time needed to prepare the quote depends on the checks and the trades concerned. It is clarified with the information gathered during the visit.
Yes. We first look for the cause, then redo it with tape and filler.
Boards are quicker and dry straight away. Traditional plaster remains useful on old walls.
How we work in Vernier
Partitions are built on a metal frame filled with insulation, then closed with plasterboard. The joints are finished in three passes with tape, then sanded.
Wet rooms receive moisture-resistant boards. Ceilings include the access hatches and the planned light fittings.
Planning a project in Vernier? MS Contractor SA, a building and renovation company in Geneva, works in houses, villas and apartments, with a no-obligation quote.
