Building permit, APA and application file in Pregny-Chambésy

Before your work, gather the plans and describe the changes you have in mind. If you want to add an outdoor structure, its use, position and dimensions make it possible to prepare the necessary checks. Distinguish the elements to keep from those that need to be redone.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Let’s talk about your home in Pregny-Chambésy

Tell us about the project as you see it. We come to measure and look at the actual condition before answering you. The quote remains no-obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To add an outdoor structure, your quote request should specify the boundaries between the parts being kept and the new work. Present the planned changes with the plans and any discussions already under way before scheduling the work. With this information, MS Contractor SA can specify the scope to be priced.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

Redoing a bathroom like for like requires nothing in principle. Changing the exterior appearance, creating habitable floor space, touching the structure or felling a protected tree is another matter. In between, there are borderline cases. A change of façade colour or the replacement of shutters are good examples.

We examine your project and tell you frankly whether an application must be submitted, and of what type. A small project generally goes through the fast-track route, known as APA. A large extension goes through a full application.

What a good application contains

The documents for the application are defined with the project. Plans, photos, specifications and any supporting documents must correspond to the chosen work. Preparation helps check that they are consistent, without ruling out requests for additional information.

Before designing an alteration in Pregny-Chambésy, gather the documents for the plot. Any applicable rules on density, distance and height must be checked for the location concerned. The mere presence of a villa does not allow any conclusion about what the plot permits.

For an old villa, the original plans are sometimes missing. We then carry out a complete survey of the existing building. It is preliminary work that is then used for the project itself.

Neighbours, lake and trees

On the right bank, some plots overlook the lake or are close to it. Lakeside areas are subject to special protection rules. Large trees often surround the houses, and felling them also requires a permit.

The project is published and the neighbours can submit comments. We advise talking to them beforehand. A simple explanation defuses many objections.

In the village core of Pregny-Chambésy, for an old house, the exterior appearance receives particular attention.

From permit to site

Once the permit has been obtained, we comply with the conditions set in the decision. We carry out the work with our own team, which avoids an authorised project being changed afterwards without saying so. Send us a sketch or a few photos and we will look together at the way forward.

What the works include

This list gives an idea of the work. The exact content depends on what we find on site.

  • Preparing the useful technical information
  • Coordination before the works start
  • Identifying the approvals to obtain
  • Checking the scope subject to a permit

Frequently asked questions about building permits in Pregny-Chambésy

We gather the plans and technical documents with the architect or engineer when one is needed.

Yes. A small job is prepared like a big one. We come and see before giving you an answer.

It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.

The procedures depend on the work and the building. Present the changes considered and the available documents so that the applicable conditions can be checked before the works.

How we work in Pregny-Chambésy

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Pregny-Chambésy? MS Contractor SA, a building company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

Arrange a visit in Pregny-Chambésy

We get back to you to agree on a visit date that suits you. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française