Locality in the canton of Geneva · House, villa and apartment
Plumbing and bathroom installations in Veyrier with our partners
The plans and observations available help specify your plumbing project in Veyrier. If you want to adapt the plumbing connections, the parts concerned and the access options must be examined before the adaptations are defined. Other work planned in the same area can change the preparation and the sequence of trades.
Our projects
Your wishes are our starting pointThe rooms to transform and the elements to keep
One contact once the permit is grantedAll the trades brought together in one project
A quote to help you decideA detailed scope, with no obligation
Building work in Veyrier?
Explain your project or work to us in a few lines. A site visit serves as the basis for the quote. The quote remains no-obligation.
MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland
To adapt the plumbing connections, your quote request should specify the interventions planned with the other trades and their junctions. Indicate the fixtures to move and the coverings to keep so that the connections can be prepared. With this information, MS Contractor SA can specify the scope to be priced.
Defining your plumbing project
The expected uses make it possible to prepare the layout before choosing the fixtures.
- State the fixtures to replace, move or add.
- Photograph the whole room, then the visible supply and waste pipes.
- Explain how you would like to use the room and attach a dimensioned plan if you have one.
The visit makes it possible to check the possible layouts and the accessible connections.
Moving a fixture depends in particular on the networks and the configuration of the space.
Present my projectDetails for your project
Overall views and details of work to help you clarify what you want. Some photos show existing spaces or equipment being installed.

Bathroom fit-out with a vanity unit, vertically lit mirror, wall-hung toilet and beige tiles.

View of the sanitary fixtures and brown tiled walls of a bathroom whose fittings are being installed.

Sanitary fit-out with a wall-hung toilet, white basin and brown tiled wall covering.

View of a bathroom combining a shower, a wall-hung toilet, brown walls and light wall surfaces.
Examining the plumbing installations and connections
Before pipes are kept behind the new finishes, their condition must be examined. Indicate drops in flow, leaks and the known materials. Replacements and connections are defined with the points to redo found and the new layout.
The drains are also checked. An insufficient fall or a pipe that is too small explains a shower tray that empties slowly. Now is the time to correct it.
Switching to a level-access shower
Replacing the bathtub with a floor-level shower is a very frequent request. Height is needed under the tiles for the fall and the trap. On a concrete slab, this height is created by raising the rest of the room or by installing an extra-flat trap. In an apartment, we look at what runs through the ceiling of the neighbour below.
Waterproofing under the tiles is essential. Liquid membrane or sheet membrane, tapes at the corners, sleeves around the supply pipes. It is invisible once the room is finished, but it is what protects the house.
Coordinating several trades in a small room
A bathroom brings together plumbing, electrics, ventilation, plastering, tiling and painting within a few square metres. With our partners, we bring together thirty-five trades behind a single person who follows your project once the permit is granted. The interventions follow on without downtime, and each trade knows where the other has left its connection points.
We plan the ventilation from the start. A room without a window needs an effective extractor fan, otherwise the grout soon turns black.
In a co-ownership (PPE), giving notice before cutting off the water
In a building, the water risers are shared. Cutting off the water for a connection sometimes affects the whole floor. We organise it with the property management agency or the administrator and post the times in the entrance.
Send us the plan or a few photos of your bathroom in Veyrier, and tell us what you would like to change. We will then arrange a visit to look at the water supply and drainage.
What the works include
Depending on the age of the building and its condition, some items drop out and others are added.
- Taps and sanitary equipment by our partners
- Tests by our partners before the casings are closed
- Showers, baths, washbasins and WCs by our partners
- Supply and drainage by our partners
Do you have commercial premises in Veyrier? We also work for shops, practices and offices.
Frequently asked questions about plumbing installations in Veyrier
Often yes. The gradient of the drain needs checking. We check it during the visit.
Yes. A small job is prepared like a big one. We come and see before giving you an answer.
Yes, when they are old, our partner plumber replaces them. It is the right time, since the walls are open.
For a complete renovation, allow a few weeks. A toilet can be kept in service if the home has only one.
How we work in Veyrier
The existing risers and drains determine where the fittings can go. Our partner plumber lays the supplies and the waste pipes with the right slope, then pressure-tests them before closing the walls.
The waterproofing of the shower areas is done before tiling. Our partners install the fittings and taps last, then adjust them.
Planning a project in Veyrier? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.