MS Contractor SA

Locality in the canton of Geneva · House, villa and apartment

Building permit, APA and application file in Veyrier

Before your work, gather the plans and describe the changes you have in mind. If you want to change an opening in the building, the position and appearance of the opening are part of the information to prepare with the building. Other work planned in the same area can change the preparation and the sequence of trades.

Our projects
Commercial premises under renovation with an exposed technical ceiling and white walls

Our projects

Loading photos

See all our projects
01

Your wishes are our starting pointThe rooms to transform and the elements to keep

02

One contact once the permit is grantedAll the trades brought together in one project

03

A quote to help you decideA detailed scope, with no obligation

Let’s talk about your home in Veyrier

Tell us what you want to redo. We come to see the home before pricing anything. The quote still comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

To change an opening in the building, your quote request should specify the interventions planned with the other trades and their junctions. Present the changes planned with the plans and the discussions already under way before scheduling the work. The quote can then distinguish the work to go ahead with from the options to discuss.

Gathering the documents for your transformation

The procedure to consider depends on the building and the exact nature of the project.

  • Describe the changes you want, distinguishing the interior, the openings and the surroundings.
  • Send the existing plans and the building documents you have.
  • Mention any discussions already under way with the property management agency, the co-owners or the authorities.

We review the project and the missing information to identify the checks to carry out.

The procedures and decisions required remain to be confirmed with the competent bodies.

Present my project

Describing the changes before the permit procedures

Everything starts from a single question. Does anything need to be submitted? For interior work with no change to the structure or the façade, often not. As soon as the exterior appearance changes, the floor area increases or load-bearing walls are touched, it must be checked.

We look at your plot, the land register plan and the exact nature of the work. This step avoids two frequent mistakes. Submitting a heavy application for nothing, or starting without anything and having to stop.

APA or DD depending on the scale

The canton has two main routes. The APA, the accelerated procedure, suits minor work. The definitive application, or DD, concerns larger projects such as an extension or a new building. The choice depends on the project, not on our preference.

Timescales vary with the authorities’ workload and the complexity of the application. We do not promise a response date. We do, however, prepare a complete application from the first submission, which limits requests for additional information.

What goes into the application

Site plans, floor plans, sections and elevations, photos of the existing situation, a description of materials and colours. For a house close to the boundary, we check the distances and the direct views onto the neighbour. For a pool or an extension, we also look at the trees and rainwater infiltration.

In villa neighbourhoods, talking to the neighbour before submission often helps. A project explained calmly attracts fewer objections than a notice discovered in the official gazette.

After the canton’s decision

The permit issued often comes with conditions, which we apply to the letter on site. We include them in the work schedule and keep the approved plans on site. We also report the start and end of the work when the permit requires it.

Tell us about your project, even at the idea stage, and we will tell you which procedure it requires.

The work possible in Veyrier

This list gives an idea of the work. The exact content depends on what we find on site.

  • Identifying the approvals to obtain
  • Checking the scope subject to a permit
  • Preparing the useful technical information
  • Coordination before the works start

We also work for businesses in Veyrier. Shop, pharmacy or office, the works are organised around opening hours.

Frequently asked questions about building permits in Veyrier

We gather the plans and technical documents with the architect or engineer when one is needed.

Yes. A small job is prepared like a big one. We come and see before giving you an answer.

It varies depending on the procedure. We take it into account in the schedule so as not to hold up the works.

The procedures depend on the work and the building. Present the changes considered and the available documents so that the applicable conditions can be checked before the works.

How we work in Veyrier

Depending on the work, the canton of Geneva asks for a building permit or an accelerated procedure. We look with you at what your project requires before setting a schedule.

The drawings and forms are prepared by the architect or agent who works with us, and the site is planned around the processing times.

Planning a project in Veyrier? MS Contractor SA, a construction company in Geneva, works in houses, villas and apartments, with a no-obligation quote.

What next?

We get back to you to agree on a visit date that suits you. The quote comes with no obligation.

MS Contractor SA, Rue de la Servette 88, 1202 Geneva, Switzerland

Your project deserves a detailed quote from the start.

At MS Contractor SA, we study your project to price the planned work from the outset. The quote sets out the services, the finishes and any points still to be confirmed. Any change is discussed with you before the work concerned.

Request my detailed quote
Version française